Viewing Grant Proposal: NextEra Energy_Coldwater II Solar Facility
The Coldwater II Solar Facility, located in Coldwater, MI, is a 4 MWac tracker project set to commence commercial operations in 2025. This project features a ground-mount design with a 13.8 kV point of interconnection. The solar facility will interconnect into the distribution systems owned by the Coldwater Board of Public Utilities, a member of American Municipal Power (AMP). AMP is a nonprofit organization
that supplies wholesale power and services to 132 members in nine states. AMP will buy the solar generation output from the Coldwater II Solar Facility and distribute the energy and renewable energy credits (RECs) to the Coldwater Board of Public Utilities.
Comments
Comment Date: | Comment: |
---|---|
3/14/2024 3:45:03 PM |
As one of the largest energy companies in the US, not based in Michigan, I do not believe this to be a prudent use of our state's funding opportunities.
|